Takt time is the pace at which you must finish one unit to exactly meet customer demand. It is set by the customer, not by the machine. Comparing it with your cycle times tells you which stations are bottlenecks and how many people or stations a line needs.

Your data

Results

Takt time—
Takt time (minutes)—
Units per hour required—
Available time per day—
Minimum stations / operators—

Or get all 5 kits (OEE, takt, EOQ, safety stock, MTBF) in one pack: Get the 5-kit pack · US$49

How it is calculated

Available time = (Shift length − Breaks) × Shifts per day
Takt time = Available time ÷ Customer demand
Minimum stations = Total work content ÷ Takt time (rounded up)

Worked example

A 480-minute shift with 30 minutes of breaks gives 450 minutes (27,000 s). With a demand of 450 units per day, takt is 60 seconds. If one unit needs 300 seconds of total work, you need at least 5 stations.

Practical tips

Frequently asked questions

What is the difference between takt time and cycle time?

Takt time is the pace demand requires. Cycle time is how long a station actually takes. For the line to meet demand, every cycle time must be at or below takt.

Should I subtract downtime from available time?

Subtract planned time such as breaks and meetings. Do not subtract unplanned breakdowns: they are losses to eliminate, not part of the available time.

Is takt time the same as lead time?

No. Lead time is how long one unit takes from start to finish, including waiting. Takt time is how often a finished unit must come off the line.