Safety Stock & Reorder Point Calculator

Safety stock is the buffer that protects you from stockouts when demand or supplier lead times vary. The reorder point tells you at what stock level to place the next order: expected demand during the lead time plus that buffer.

Your data

Results

Safety stock—
Reorder point—
Demand during lead time—
Z factor—
Safety stock in days of cover—

Or get all 5 kits (OEE, takt, EOQ, safety stock, MTBF) in one pack: Get the 5-kit pack · US$49

How it is calculated

Z = Inverse normal of the service level (95% → 1.645)
σ = √(Lead time × σ_demand² + Avg demand² × σ_lead time²)
Safety stock = Z × σ
Reorder point = Avg daily demand × Lead time + Safety stock

Worked example

With an average demand of 100 units a day (std. dev. 20), a 9-day lead time and a 95% service level, safety stock is 1.645 × 20 × √9 ≈ 99 units and the reorder point is 900 + 99 ≈ 999 units.

Practical tips

Frequently asked questions

What service level should I use?

Many companies use 95% as a default, 98–99% for critical or high-margin items and 90% for low-value items. It is the probability of not running out during each replenishment cycle.

How do I get the standard deviation of demand?

Take your daily sales or consumption for the last 3–6 months and use STDEV.S in Excel or Google Sheets. Use the same unit (days or weeks) as your lead time.

What if my lead time is in weeks?

Then enter weekly average demand and weekly standard deviation too. The formula works with any time unit as long as it is consistent.